Our datacenter did announce that they have signed deals with both Verio and Level3 to get a 10G link from each of them in Washington, DC. This requires building out fiber paths so the ETA is late November / December time frame. (Q4 2008)
Washington, DC (wdc01) – will be 40Gs of capacity
Internap – 2x 10G
Verio – 1x 10G (coming Q4 2008)
Level3 – 1x 10G (coming Q4 2008)

